Sizer Replacement

Removal of Old Sizer On-Site

We love a challenge at Connect Group. We piloted this project to remove an old mineral sizer, including all of its electrical and instrumentation components. We removed the mineral sizer and replaced it with a brand new piece of equipment including electrical and instrumental components such as junction boxes, speed sensors, temperature panels, thermostats and motors.

This was no lean feat, as it required the use of the largest mobile crane in Alberta to lift the 270,000 lb sizer, and we actually had to modify the sizer base and mounts to accommodate for its sheer scale.

image1 (4)
image2 (3)

YOUR INDUSTRIAL SECTOR MANAGEMENT AND EXECUTION SPECIALISTS